Construction sites air pollution patrol and inspection plan in Taichung County, 2008

Absrtact
Summary This project starts from 24th, March, 2008, and ends on 28th, February, 2009 with a total expenditure of NT 12929700 dollars. The main work items includes patrol of construction sites in Taichung county, giving citation of polluted construction sites and command their improvement, building a platform with pipeline and road construction units, forcing construction sites to sign their completion form when the construction is finished, asking new construction sites to pay the air pollution fee, doing the database key-ins and filing the files, developing three information management systems for the project etc. All work items on the contract are completed. The project team patrols the construction sites and input the data into database system based on a monthly schedule, includes first rank and second rank new construction sites patrol rates at 67% and 68% for the current month; those at 94% and 79% for late month, and 91% of the patrol results were signed by the construction sites, far above the contract requirement. A total of 61% patrol rate is performed by this project; among them, 71% patrol rate is performed for first rank construction sites, and 98% of them are compliance with the regulation, 58% patrol rate is performed for second rank construction sites, and 96% of them are compliance with the regulation. 192 sites were found polluted and fined. There are also 50 construction sites take action to sweep and wash the roads or streets around the sites at a daily base, and 32219 Km roads or streets were done for this job. Regulation Guidance pamphlets, folders, regulation brochures were designed and printed at early stage of the project. The broadcast regulation guidance announcements were divided into two phases ( in July and November). The construction sites calendar of Year 2009 were printed and delivered in December, 2008. Ambient particle monitoring and sulfur content test of mobile vehicles were accomplished for 44 times each, and the test results are compliance with the regulation. A barcode data management system for Taichung county construction sites air pollution fee was established and started on 10th, June, 2008. A pollution map for Taichung county construction sites was set up in October, 2008. A user-friendly application system for Taichung county construction sites air pollution fee was developed by December, 2008. This system is provided to the people for use. And 80% of construction sites which were finished their works came back to finish their final stage air pollution fee application form, those who haven’t came back are extending their work period. And all new construction sites who filled the air pollution fee application forms are 100% charged. Finally, the project team achieved each work items as planned, and being ranked as second place from the EPB, Taichung county. It shows that the good performance of this project.
Keyword
Construction Engineering,
Open
top